Powered land · North Rhine-Westphalia

59 ha site at Gemarkung Gevelsberg, Flur 26, Flurstück 74

A candidate site of 59.4 ha in North Rhine-Westphalia, made up of 1 cadastral parcel, mostly forest. It lies 0.61 km from an unnamed 110 kV substation (AVU, Gevelsberg). The nearest transmission substation, Garenfeld (220 kV), is 12.9 km away, where the grid development plan lists 2 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area59.4 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Gevelsberg, Flur 26, Flurstück 74)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useForest (Wald) (100% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.3221, 7.3696 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substation110 kV substation (OSM way/144635337) (0.61 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorAVU, GevelsbergOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationGarenfeld (12.9 km from the nearest parcel, 220 kV, Enervie Vernetzt GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substationMSCDN (1x) (due 2030); Short-circuit strength upgrade (due 2037) (Netzentwicklungsplan)Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026

How it compares

#245 of 632 sites in North Rhine-Westphalia and #2,090 of 4,863 in Germany by site score. Larger than 44% of the sites in North Rhine-Westphalia. Closer to its substation than 76% of them.

PartThis sitePointsOf
Area59.4 ha1935
Distance to the substation0.61 km24.335
Substation voltage110 kV1030
Site score53100

How the site score works in Germany · Search sites in North Rhine-Westphalia

Data on this page