Powered land · North Rhine-Westphalia

117 ha site at Gemarkung Belecke, Flur 5, Flurstück 180

A candidate site of 117 ha in North Rhine-Westphalia, made up of 1 cadastral parcel, mostly forest. It lies 0.81 km from the 110 kV substation Belecke (Westnetz GmbH). The nearest transmission substation, Station Nehden (380 kV), is 19.6 km away.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area117 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Belecke, Flur 5, Flurstück 180)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useForest (Wald) (94% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.4749, 8.3498 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationBelecke (0.81 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorWestnetz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationStation Nehden (19.6 km from the nearest parcel, 380 kV, Amprion GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Large generation within 10 km66 MW of wind (1 plant of 50 MW or more in operation)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressLow (under 10%) (score 0.6 of 5, withdrawals 7.5% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#70 of 632 sites in North Rhine-Westphalia and #648 of 4,863 in Germany by site score. Larger than 85% of the sites in North Rhine-Westphalia. Closer to its substation than 67% of them.

PartThis sitePointsOf
Area117 ha3535
Distance to the substation0.81 km20.835
Substation voltage110 kV1030
Site score66100

How the site score works in Germany · Search sites in North Rhine-Westphalia

Nearby sites on the same substation

2 other sites have Belecke as nearest substation and would compete for its capacity.

Data on this page