Powered land · Hesse
210 ha site at Gemarkung Wächtersbach, Flur 13, Flurstück 1/12
A candidate site of 210 ha in Hesse, made up of 1 cadastral parcel. It lies 1.18 km from the 110 kV substation Wächtersbach (Avacon Netz GmbH). The nearest transmission substation, Großkrotzenburg (380 kV), is 27.5 km away, where the grid development plan lists 4 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 210 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Wächtersbach, Flur 13, Flurstück 1/12) | ALKIS Hessen (open cadastre) · Free use without restriction or condition · checked 24 Oct 2026 |
| Location | Hesse | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.2370, 9.2649 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Wächtersbach (1.18 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Avacon Netz GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Großkrotzenburg (27.5 km from the nearest parcel, 380 kV, TenneT TSO GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | Synchronous condenser (1x) (due 2026); 380/110 kV transformer (2x) (due 2026); 380/220 kV transformer (3x) (due 2026-2028); 1 more (Netzentwicklungsplan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#83 of 399 sites in Hesse and #1,217 of 4,863 in Germany by site score. Larger than 95% of the sites in Hesse. Closer to its substation than 55% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 210 ha | 35 | 35 |
| Distance to the substation | 1.18 km | 14.4 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 59 | 100 |
Nearby sites on the same substation
2 other sites have Wächtersbach as nearest substation and would compete for its capacity.
- 59 ha site at Gemarkung Aufenau, Flur 30, Flurstück 100.35 km · score 58
- 414 ha site at Gemarkung Wächtersbach, Flur 14, Flurstück 18/31.66 km · score 51
- Sites in Hesse403
- Sites in Germany5,000
- Wächtersbachsubstation
Data on this page
- ALKIS Hessen (open cadastre). ALKIS Hessen (open cadastre), Free use without restriction or condition.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.