Powered land · Hesse
51 ha site at Gemarkung Ober-Mockstadt, Flur 11, Flurstück 1
A candidate site of 50.6 ha in Hesse, made up of 1 cadastral parcel. It lies 0.44 km from the 150 kV substation Ranstädter Weg (Oberhessische Versorgungsbetriebe AG). The nearest transmission substation, Umspannwerk Karben (380 kV), is 19.4 km away, where the grid development plan lists 4 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 50.6 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Ober-Mockstadt, Flur 11, Flurstück 1) | ALKIS Hessen (open cadastre) · Free use without restriction or condition · checked 24 Oct 2026 |
| Location | Hesse | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.3438, 8.9745 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Ranstädter Weg (0.44 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 150 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Oberhessische Versorgungsbetriebe AG | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Karben (19.4 km from the nearest parcel, 380 kV, TenneT TSO GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380/110 kV transformer (3x) (due 2026); 380/110 kV transformer (1x) (due 2026); Short-circuit current limiting reactor (due 2030); 1 more (Netzentwicklungsplan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#156 of 399 sites in Hesse and #2,108 of 4,863 in Germany by site score. Larger than 10% of the sites in Hesse. Closer to its substation than 87% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 50.6 ha | 16 | 35 |
| Distance to the substation | 0.44 km | 27.3 | 35 |
| Substation voltage | 150 kV | 10 | 30 |
| Site score | 53 | 100 |
- Sites in Hesse403
- Sites in Germany5,000
- Ranstädter Wegsubstation
Data on this page
- ALKIS Hessen (open cadastre). ALKIS Hessen (open cadastre), Free use without restriction or condition.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.