Powered land · Hesse
74 ha site at Gemarkung Großauheim, Flur 106, Flurstück 9/8
A candidate site of 74.4 ha in Hesse, made up of 1 cadastral parcel. It lies 1.85 km from the 110 kV substation UW Wolfgang (Avacon Netz / EAM Netz GmbH). The nearest transmission substation, Großkrotzenburg (380 kV), is 3.1 km away, where the grid development plan lists 4 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 74.4 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Großauheim, Flur 106, Flurstück 9/8) | ALKIS Hessen (open cadastre) · Free use without restriction or condition · checked 24 Oct 2026 |
| Location | Hesse | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.1042, 8.9926 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | UW Wolfgang (1.85 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV (levels 110, 20, 0.4 kV) | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Avacon Netz / EAM Netz GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Großkrotzenburg (3.1 km from the nearest parcel, 380 kV, TenneT TSO GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026 |
| Planned at that substation | Synchronous condenser (1x) (due 2026); 380/110 kV transformer (2x) (due 2026); 380/220 kV transformer (3x) (due 2026-2028); 1 more (Netzentwicklungsplan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#325 of 399 sites in Hesse and #4,131 of 4,863 in Germany by site score. Larger than 59% of the sites in Hesse. Closer to its substation than 12% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 74.4 ha | 24.3 | 35 |
| Distance to the substation | 1.85 km | 2.6 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 37 | 100 |
Nearby sites on the same substation
2 other sites have UW Wolfgang as nearest substation and would compete for its capacity.
- 163 ha site at Gemarkung Langendiebach, Flur 26, Flurstück 8/241.06 km · score 61
- 124 ha site at Gemarkung Hanau, Flur 69, Flurstück 3/201.3 km · score 57
- Sites in Hesse403
- Sites in Germany5,000
- UW Wolfgangsubstation
Data on this page
- ALKIS Hessen (open cadastre). ALKIS Hessen (open cadastre), Free use without restriction or condition.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.