Powered land · Baden-Württemberg

73 ha site at Gemarkung Neckartenzlingen, Flur 1, Flurstück 225

A candidate site of 72.7 ha in Baden-Württemberg, made up of 1 cadastral parcel. It lies 0.62 km from the 110 kV substation Umspannwerk Neckartenzlingen (Netze BW GmbH). The nearest transmission substation, Umspannwerk Metzingen (380 kV), is 5.3 km away.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area72.7 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Neckartenzlingen, Flur 1, Flurstück 225)ALKIS Baden-Württemberg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026
LocationBaden-WürttembergRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates48.5798, 9.2162 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Neckartenzlingen (0.62 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorNetze BW GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Metzingen (5.3 km from the nearest parcel, 380 kV, Netze BW GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Large generation within 10 km90 MW of pumped storage (1 plant of 50 MW or more in operation)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressHigh (40–80%) (score 3.5 of 5, withdrawals 55.5% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#403 of 1,037 sites in Baden-Württemberg and #1,390 of 4,863 in Germany by site score. Larger than 35% of the sites in Baden-Württemberg. Closer to its substation than 76% of them.

PartThis sitePointsOf
Area72.7 ha23.735
Distance to the substation0.62 km24.235
Substation voltage110 kV1030
Site score58100

How the site score works in Germany · Search sites in Baden-Württemberg

Nearby sites on the same substation

1 other site has Umspannwerk Neckartenzlingen as nearest substation and would compete for its capacity.

Data on this page