Powered land · Baden-Württemberg
53 ha site at Gemarkung Bleibach, Flurstück 472
A candidate site of 52.6 ha in Baden-Württemberg, made up of 1 cadastral parcel. It lies 1.3 km from the 110 kV substation Umspannwerk Bleibach (Netze BW GmbH). The nearest transmission substation, 380-kV-Umspannwerk Eichstetten, is 20.9 km away, where the grid development plan lists 2 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 52.6 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Bleibach, Flurstück 472) | ALKIS Baden-Württemberg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026 |
| Location | Baden-Württemberg | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 48.1261, 8.0359 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Bleibach (1.3 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV (levels 110, 20 kV) | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Netze BW GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | 380-kV-Umspannwerk Eichstetten (20.9 km from the nearest parcel, 380 kV, TransnetBW GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | MSCDN (due 2028); E-STATCOM (due 2030) (Netzentwicklungsplan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#909 of 1,037 sites in Baden-Württemberg and #3,971 of 4,863 in Germany by site score. Larger than 11% of the sites in Baden-Württemberg. Closer to its substation than 44% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 52.6 ha | 16.7 | 35 |
| Distance to the substation | 1.3 km | 12.3 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 39 | 100 |
How the site score works in Germany · Search sites in Baden-Württemberg
Nearby sites on the same substation
2 other sites have Umspannwerk Bleibach as nearest substation and would compete for its capacity.
- 140 ha site at Gemarkung Kollnau, Flurstück 2381.18 km · score 59
- 77 ha site at Gemarkung Kollnau, Flurstück 3091.9 km · score 37
- Sites in Baden-Württemberg1,059
- Sites in Germany5,000
- Umspannwerk Bleibachsubstation
Data on this page
- LGL-BW (2026) Datenlizenz Deutschland - Namensnennung - Version 2.0, www.lgl-bw.de. ALKIS Baden-Württemberg (open cadastre), dl-de/by-2-0.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.