Milford Solar Phase II
Milford Solar Phase II is a power plant under construction in Utah, United States, with 310 MW of capacity, owned by Milford Solar Phase II, LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Utah | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Status | Under construction | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Start year | 2027 | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Owner | Milford Solar Phase II, LLC | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Operator | Milford Solar Phase II, LLC | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Capacity | 310 MW | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Technology | Solar Photovoltaic | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Coordinates | 38.5224, -113.0148 | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its owner? Ask us.
How it compares
Milford Solar Phase II is the 6th-largest of 11 power plants planned, permitted or under construction in Utah and the 226th-largest of 835 in the United States by capacity; its 310 MW is 0.11% of the 282,375 MW of power plants planned, permitted or under construction we hold for the United States. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Utah | 6th of 11 | 4,506 MW | 6.9% |
| United States | 226th of 835 | 282,375 MW | 0.11% |
| All power plants planned, permitted or under construction in our data | 259th of 3,008 | 360,526 MW | <0.1% |
Owner, operator and place
Other power plants in Utah
- Hunter1,472 MW
- Lake Side Power Plant1,247 MW
- Intermountain Power Project1,093 MW
- Huntington1,016 MW
- Currant Creek567 MW
- Faraday Solar525 MW
- Bonanza512 MW
- Intermountain Pumped Storage Project1,000 MW · planned