Power plant · California, United States

EDPR CA Solar Park VI LLC (CA) Hybrid

EDPR CA Solar Park VI LLC (CA) Hybrid is a power plant under construction in California, United States, with 241 MW of capacity, owned by EDP Renewables North America LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCaliforniaEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
StatusUnder constructionEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
Start year2026EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
OwnerEDP Renewables North America LLCEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
OperatorEDPR CA Solar Park VI LLCEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
Capacity241 MWEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
TechnologySolar PhotovoltaicEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
Coordinates36.6254, -120.3789EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its owner? Ask us.

How it compares

EDPR CA Solar Park VI LLC (CA) Hybrid is the 32nd-largest of 53 power plants planned, permitted or under construction in California and the 346th-largest of 835 in the United States by capacity; its 241 MW is <0.1% of the 282,375 MW of power plants planned, permitted or under construction we hold for the United States. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
California32nd of 5319,171 MW1.3%
United States346th of 835282,375 MW<0.1%
All power plants planned, permitted or under construction in our data643rd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 7 water rights (4 active), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
San Joaquin River municipal and irrigation right A031153Water right750,000 acre-ft/yearPlanned10 km
Mendota Pool irrigation right S001098Water right108,660 acre-ft/yearActive17 km
Kings River municipal and irrigation right A032810Water right1,000,000 acre-ft/yearPlanned17 km

Owner, operator and place

More from EDP Renewables North America LLC

Other power plants in California

All 100 power plants in California, United States