Aratina Solar Center 2 is a power plant under construction in California, United States, with 263 MW of capacity, owned by 45MG 8me LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | California | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Status | Under construction | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Start year | 2026 | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Owner | 45MG 8me LLC | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Operator | 45MG 8me LLC | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Capacity | 263 MW | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Technology | Solar Photovoltaic | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Coordinates | 35.0630, -118.0878 | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its owner? Ask us.
How it compares
Aratina Solar Center 2 is the 29th-largest of 53 power plants planned, permitted or under construction in California and the 292nd-largest of 835 in the United States by capacity; its 263 MW is <0.1% of the 282,375 MW of power plants planned, permitted or under construction we hold for the United States. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| California | 29th of 53 | 19,171 MW | 1.4% |
| United States | 292nd of 835 | 282,375 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 576th of 6,455 | 664,240 MW | <0.1% |
Owner, operator and place
Other power plants in California
- Diablo Canyon2,323 MW
- Dynegy Moss Landing Power Plant Hybrid1,848 MW
- Haynes1,739 MW
- Castaic1,682 MW
- Ormond Beach1,612 MW
- Geysers Unit 5-201,236 MW
- La Paloma Generating Plant1,156 MW
- AES Alamitos LLC1,115 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.