Power plant · Asten, North Brabant, Netherlands

Solar Asten (Trio Solar 5)

Solar Asten (Trio Solar 5) is a cancelled solar power plant in Asten, North Brabant, Netherlands, with 3.91 MW of capacity, operated by Trio Solar 5 B.V.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAstenRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusCancelled (withdrawn from the list of projects in management before it was realised)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorTrio Solar 5 B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity3.91 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologySolarRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Coordinates51.3845, 5.8382RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Solar Asten (Trio Solar 5) is the 163rd-largest of 431 power plants in North Brabant and the 976th-largest of 2,153 in the Netherlands by capacity; its 3.91 MW is <0.1% of the 37,513 MW we hold for the Netherlands. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
North Brabant163rd of 4313,564 MW0.11%
Netherlands976th of 2,15337,513 MW<0.1%
All power plants in our data12,981st of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 748 permit notices, 104 substations, 36 CO2 emitters (27 operating) and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Nitrogen natuurvergunning application, Peel en Maas (prb-2026-4755)Permit notice——5.1 km
Nitrogen natuurvergunning application, Peel en Maas (prb-2025-15799)Permit notice——5.1 km
Nitrogen natuurvergunning application, Peel en Maas (prb-2025-12937)Permit notice——5.2 km
Biomass heat Someren (Peelpluim)CO2 emitter—Operating7.1 km
Biomass heat Ospel (BMP)CO2 emitter—Operating7.8 km
Green gas Heythuysen (Holmel)CO2 emitter—Operating9.6 km
150 kV HeldenSubstation——13 km
150 kV Helmond OostSubstation——14 km
150 kV Helmond ZuidSubstation——14 km

Operator and place

More from Trio Solar 5 B.V.

Other power plants in North Brabant

All 481 power plants in North Brabant, Netherlands