Power plant · Horst aan de Maas, Limburg, Netherlands
Solar Melderslo (Trio Solar 5)
Solar Melderslo (Trio Solar 5) is a planned power plant in Horst aan de Maas, Limburg, Netherlands, with 2.6 MW of capacity, operated by Trio Solar 5 B.V.
We hold more on this asset.Grid operator and location: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Location | Horst aan de Maas | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Address | Broekhuizerdijk 18, 5962 NM Melderslo | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Trio Solar 5 B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 2.6 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Rooftop solar | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 51.4653, 6.0988 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Solar Melderslo (Trio Solar 5) is the 22nd-largest of 37 power plants planned, permitted or under construction in Limburg and the 166th-largest of 225 in the Netherlands by capacity; its 2.6 MW is <0.1% of the 3,053 MW of power plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Limburg | 22nd of 37 | 255 MW | 1% |
| Netherlands | 166th of 225 | 3,053 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,908th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 718 permit notices, 171 substations, 48 CO2 emitters (24 operating), 8 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Nitrogen natuurvergunning application, Horst aan de Maas (prb-2025-7305) | Permit notice | — | — | 0.9 km |
| Nitrogen natuurvergunning decision, Horst aan de Maas (prb-2026-16162) | Permit notice | — | — | 0.9 km |
| Nitrogen natuurvergunning draft decision, Horst aan de Maas (prb-2026-12109) | Permit notice | — | — | 0.9 km |
| 150 kV Horst | Substation | — | — | 1.8 km |
| Green gas Grubbenvorst (Bio Energiecentrale Maashorst) | CO2 emitter | — | Cancelled | 3.5 km |
| Green gas Horst (Ashorst) | CO2 emitter | — | Operating | 4.0 km |
| Geothermal heat Horst (NAPPA) | CO2 emitter | — | Operating | 4.1 km |
| 150 kV Californië | Substation | — | — | 4.8 km |
| 150 kV Boekend | Substation | — | — | 8.4 km |
Operator and place
More from Trio Solar 5 B.V.
- Solar Klazienaveen (Trio Solar 5)40.5 MW
- Solar Bergschenhoek (Trio Solar 5)19.2 MW
- Solar Oude-Tonge (Trio Solar 5)18.8 MW · planned
- Solar Tinte (Trio Solar 5)15 MW · planned
- Solar Huissen (Trio Solar 5)14.7 MW
- Solar Vierpolders (Trio Solar 5)10.1 MW · planned
- Solar Dongen (Trio Solar 5)10 MW
- Solar Helenaveen (Trio Solar 5)9.94 MW
Other power plants in Limburg
- Clauscentrale1,304 MW
- Swentiboldcentrale230 MW
- Solar Bergen L (Energielandgoed Wells Meer Zon)64.5 MW
- Windpark Greenport Venlo34.8 MW
- Solar Velden (XAAM Verduurzamen II)30.2 MW
- Zonnepark Bergweg Mariahoop29.1 MW
- Wind Bergen L (Energielandgoed Wells Meer Wind)26.4 MW
- Solar Grubbenvorst (Karakter Two Energie)24.9 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.