Power plant · Venlo, Limburg, Netherlands
Solar Arcen (One Solar Beheer VIII)
Solar Arcen (One Solar Beheer VIII) is a planned solar power plant in Venlo, Limburg, Netherlands, with 2.25 MW of capacity, operated by One Solar Beheer VIII B.V.
We hold more on this power plant.Grid operator: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Venlo | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Address | Verlengde Roobeekweg 8, 5944 NR Arcen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | One Solar Beheer VIII B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 2.25 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Rooftop solar | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 51.5023, 6.1786 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Solar Arcen (One Solar Beheer VIII) is the 25th-largest of 37 power plants planned, permitted or under construction in Limburg and the 179th-largest of 225 in the Netherlands by capacity; its 2.25 MW is <0.1% of the 3,053 MW of power plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Limburg | 25th of 37 | 255 MW | 0.88% |
| Netherlands | 179th of 225 | 3,053 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,450th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 707 permit notices, 195 substations, 48 CO2 emitters (23 operating), 5 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Nitrogen natuurvergunning application, Horst aan de Maas (prb-2025-4931) | Permit notice | — | — | 1.7 km |
| Nitrogen natuurvergunning application, Venlo (prb-2025-17579) | Permit notice | — | — | 2.0 km |
| Nitrogen natuurvergunning decision, Venlo (prb-2026-14951) | Permit notice | — | — | 2.0 km |
| Biomass heat Lomm (Aviko B.V. (Locatie Lomm)) | CO2 emitter | — | Operating | 6.1 km |
| Green gas Well L (Ecofuels) | CO2 emitter | — | Operating | 7.3 km |
| 150 kV Horst | Substation | — | — | 8.6 km |
| Green gas Grubbenvorst (Bio Energiecentrale Maashorst) | CO2 emitter | — | Cancelled | 8.7 km |
| UA Baersdonk | Substation | — | — | 9.7 km |
| 110 kV substation (OSM way/92356639) | Substation | — | — | 9.7 km |
Operator and place
More from One Solar Beheer VIII B.V.
- Solar Heusden Gem Asten (One Solar Beheer VIII)38.5 MW
- Solar Sexbierum (One Solar Beheer VIII)36.7 MW
- Solar Sexbierum (One Solar Beheer VIII)14.8 MW · planned
- Solar Sexbierum (One Solar Beheer VIII)11.1 MW
- Solar Coevorden (One Solar Beheer VIII)7.73 MW · planned
- Solar Venlo (One Solar Beheer VIII)4.77 MW · planned
- Solar Heerlen (One Solar Beheer VIII)4.68 MW · planned
- Solar Eindhoven (One Solar Beheer VIII)4.16 MW · planned
Other power plants in Limburg
- Clauscentrale1,304 MW
- Swentiboldcentrale230 MW
- Solar Bergen L (Energielandgoed Wells Meer Zon)64.5 MW
- Windpark Greenport Venlo34.8 MW
- Solar Velden (XAAM Verduurzamen II)30.2 MW
- Zonnepark Bergweg Mariahoop29.1 MW
- Wind Bergen L (Energielandgoed Wells Meer Wind)26.4 MW
- Solar Grubbenvorst (Karakter Two Energie)24.9 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.