Power plant · Druten, Gelderland, Netherlands
Zonnepark Zevend
Zonnepark Zevend is a permitted power plant in Druten, Gelderland, Netherlands, with 11 MW of capacity, operated by Zonnepark Zevend B.V.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Druten | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Permitted (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Zonnepark Zevend B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 11 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Ground-mounted solar | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Coordinates | 51.8990, 5.6051 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Zonnepark Zevend is the 20th-largest of 46 power plants planned, permitted or under construction in Gelderland and the 75th-largest of 225 in the Netherlands by capacity; its 11 MW is 0.36% of the 3,053 MW of power plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Gelderland | 20th of 46 | 465 MW | 2.4% |
| Netherlands | 75th of 225 | 3,053 MW | 0.36% |
| All power plants planned, permitted or under construction in our data | 5,225th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 1,073 permit notices, 80 substations, 61 CO2 emitters (41 operating) and 12 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar park omgevingsplan decision (refused), Druten (gmb-2025-357198) | Permit notice | — | — | 3.0 km |
| Solar park omgevingsplan draft decision (refused), Druten (gmb-2024-505108) | Permit notice | — | — | 3.0 km |
| 150 kV Druten | Substation | — | — | 3.4 km |
| Nitrogen natuurvergunning decision, Druten (prb-2026-5116) | Permit notice | — | — | 3.7 km |
| 380 kV Dodewaard | Substation | — | — | 5.1 km |
| 150 kV Dodewaard | Substation | — | — | 5.7 km |
| Biomass heat Lienden (P.C. van Tuijl Kesteren) | CO2 emitter | — | Operating | 8.2 km |
| Green gas Weurt (Arn) | CO2 emitter | — | Permitted | 14 km |
| Green gas Weurt (ARN) | CO2 emitter | — | Operating | 14 km |
Operator and place
Other power plants in Gelderland
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.