Power plant · Lelystad, Flevoland, Netherlands

Solar Lelystad (Sunrock Assets XII)

Solar Lelystad (Sunrock Assets XII) is a planned power plant in Lelystad, Flevoland, Netherlands, with 10.1 MW of capacity, operated by Sunrock Assets XII B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLelystadRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
AddressBuitenhavenweg 43, 8221 RJ LelystadRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusPlanned (SDE subsidy granted, not yet in use)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorSunrock Assets XII B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity10.1 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyRooftop solarRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates52.5500, 5.5148RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Solar Lelystad (Sunrock Assets XII) is the 4th-largest of 11 power plants planned, permitted or under construction in Flevoland and the 80th-largest of 225 in the Netherlands by capacity; its 10.1 MW is 0.33% of the 3,053 MW of power plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Flevoland4th of 11305 MW3.3%
Netherlands80th of 2253,053 MW0.33%
All power plants planned, permitted or under construction in our data5,289th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 692 permit notices, 79 substations, 51 data centers, 45 CO2 emitters (28 operating), 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Substation omgevingsvergunning application, Lelystad (gmb-2025-479761)Permit notice——1.1 km
Substation omgevingsvergunning decision, Lelystad (gmb-2026-135648)Permit notice——1.1 km
Solar park omgevingsvergunning application, Lelystad (gmb-2024-514438)Permit notice——1.4 km
ENGIE MaximacentraleCO2 emitter1,216,922 tCO2e—3.0 km
150 kV LelystadSubstation——3.1 km
380 kV LelystadSubstation——3.4 km
150 kV ZuiderveldSubstation——5.7 km
Biomass heat Lelystad (Primco BMC Lelystad)CO2 emitter—Operating7.6 km
Green gas Biddinghuizen (De Torenhoeve Biogas)CO2 emitter—Operating10 km

Operator and place

More from Sunrock Assets XII B.V.

Other power plants in Flevoland

All 129 power plants in Flevoland, Netherlands

Data on this page