Power plant · Lelystad, Flevoland, Netherlands

Solar Lelystad (GLP Lelystad Coöperatief)

Solar Lelystad (GLP Lelystad Coöperatief) is a cancelled power plant in Lelystad, Flevoland, Netherlands, with 8.35 MW of capacity, operated by GLP Lelystad Coöperatief U.A.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLelystadRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusCancelled (withdrawn from the list of projects in management before it was realised)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorGLP Lelystad Coöperatief U.A.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity8.35 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologySolarRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Coordinates52.5500, 5.5148RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Solar Lelystad (GLP Lelystad Coöperatief) is the 56th-largest of 116 power plants in Flevoland and the 603rd-largest of 2,153 in the Netherlands by capacity; its 8.35 MW is <0.1% of the 37,557 MW we hold for the Netherlands. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Flevoland56th of 1163,507 MW0.24%
Netherlands603rd of 2,15337,557 MW<0.1%
All power plants in our data7,576th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 692 permit notices, 79 substations, 51 data centers, 45 CO2 emitters (28 operating), 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Substation omgevingsvergunning application, Lelystad (gmb-2025-479761)Permit notice——1.1 km
Substation omgevingsvergunning decision, Lelystad (gmb-2026-135648)Permit notice——1.1 km
Solar park omgevingsvergunning application, Lelystad (gmb-2024-514438)Permit notice——1.4 km
ENGIE MaximacentraleCO2 emitter1,216,922 tCO2e—3.0 km
150 kV LelystadSubstation——3.1 km
380 kV LelystadSubstation——3.4 km
150 kV ZuiderveldSubstation——5.7 km
Biomass heat Lelystad (Primco BMC Lelystad)CO2 emitter—Operating7.6 km
Green gas Biddinghuizen (De Torenhoeve Biogas)CO2 emitter—Operating10 km

Operator and place