Power plant · Asturias, Spain
Soto de Ribera Power Plant
Soto de Ribera Power Plant is a coal power plant in Asturias, Spain, with 1,200 MW of capacity, owned by EDP Energía.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Asturias | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Start year | 1957 | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Owner | EDP Energía | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Operator | EDP Energía | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 1,200 MW | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Natural gas | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Hard coal | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 43.3125, -5.8744 | Wikidata · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.
Request researchHow it compares
Soto de Ribera Power Plant is the largest of 7 power plants in Asturias and the 14th-largest of 226 in Spain by capacity; its 1,200 MW is 1.5% of the 80,401 MW we hold for Spain. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Asturias | 1st of 7 | 3,594 MW | 33% |
| Spain | 14th of 226 | 80,401 MW | 1.5% |
| All power plants in our data | 319th of 12,230 | 1,691,896 MW | <0.1% |
Nearby
Within 50 km of this power plant: 5 CO2 emitters (4,693,065 tCO2e), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Central Térmica Soto 3 | CO2 emitter | 383,727 tCO2e | — | 0.3 km |
| Central Térmica de Ciclo Combinado Soto de Ribera | CO2 emitter | 756,805 tCO2e | — | 0.5 km |
| Fábrica de Cal de Tudela Veguín-Fábrica de Cales | CO2 emitter | 465,826 tCO2e | — | 8.4 km |
Owner, operator and place
More from EDP Energía
- Aboño Power Plant904 MW
- Castejón 1 and 3 Power Plant843 MW
Other power plants in Asturias
- Aboño878 MW
- Sotoribe772 MW
- Narcea502 MW
- SOTO5428 MW
- Lada Power Plant348 MW
- Salto y central hidroeléctrica de Grandas de Salime128 MW
- Tanes Pumped Storage Power Plant123 MW
- Central hidroeléctrica de Miranda64.8 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.