Power plant · Kettig, Rhineland-Palatinate, Germany
Batterie Weißenthurm-Kettig
Batterie Weißenthurm-Kettig is a planned power plant in Kettig, Rhineland-Palatinate, Germany, with 50 MW of capacity, operated by Verbund Energy4Business Germany GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Kettig | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | 56220 Kettig | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Planned | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | Verbund Energy4Business Germany GmbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Storage capacity | 100 MWh | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | Battery storage | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Grid operator | Westnetz GmbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 50.4051, 7.4489 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Batterie Weißenthurm-Kettig is the 9th-largest of 124 power plants planned, permitted or under construction in Rhineland-Palatinate and the 231st-largest of 2,173 in Germany by capacity; its 50 MW is <0.1% of the 78,152 MW of power plants planned, permitted or under construction we hold for Germany. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Rhineland-Palatinate | 9th of 124 | 3,015 MW | 1.7% |
| Germany | 231st of 2,173 | 78,152 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,832nd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 102 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Station Weißenthurm | Substation | — | — | 0.3 km |
| Station Neuwied | Substation | — | — | 3.0 km |
| 220 kV substation (OSM way/1447099504) | Substation | — | — | 3.5 km |
| Data center, Rhineland-Palatinate (OSM node 9776934144) | Data center | — | — | 23 km |
| Dernbach 2 | Data center | — | — | 24 km |
| Dernbach 3 | Data center | — | — | 24 km |
Operator, grid operator and place
More from Verbund Energy4Business Germany GmbH
- Batterie Coschütz41.4 MW · planned
- Batterie Iphofen20.7 MW
- Batterie Diespeck20.7 MW
- Batterie Schwabmünchen16 MW
- Batterie Rechtenbach16 MW
- Batterie Hessisch Lichtenau12 MW
- Batterie Eisenach10.4 MW
- Batterie Breitenworbis10 MW
Other power plants in Rhineland-Palatinate
- GuD Mitte GT121,034 MW
- KW3 GT31 (Mainz)893 MW
- HKW Wörth90.8 MW
- Solarkraftwerk Rodershausen I84.6 MW
- Windpark Ellern77.6 MW
- Neef 168.8 MW
- NxW Mastershausen I GmbH & Co. KG65.9 MW
- Pionext Solarpark Lonsheim65.4 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.