Power plant · Siedenbollentin, Mecklenburg-Vorpommern, Germany
Siedenbollentin 1.2
Siedenbollentin 1.2 is a power plant in Siedenbollentin, Mecklenburg-Vorpommern, Germany, with 17.2 MW of capacity, operated by Enerparc Solar Invest 230 TU 31 GmbH & Co. KG.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Siedenbollentin | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | 17089 Siedenbollentin | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Operating | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Start year | 2026 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | Enerparc Solar Invest 230 TU 31 GmbH & Co. KG | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 17.2 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | Solar | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Grid operator | E.DIS Netz GmbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 53.7193, 13.3945 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Siedenbollentin 1.2 is the 132nd-largest of 225 power plants in Mecklenburg-Vorpommern and the 2,192nd-largest of 4,012 in Germany by capacity; its 17.2 MW is <0.1% of the 193,669 MW we hold for Germany. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Mecklenburg-Vorpommern | 132nd of 225 | 6,434 MW | 0.27% |
| Germany | 2,192nd of 4,012 | 193,669 MW | <0.1% |
| All power plants in our data | 4,572nd of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 80 substations, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Umspannwerk Altentreptow Nord | Substation | — | — | 5.3 km |
| Iven/West substation | Substation | — | — | 8.0 km |
| Umspannwerk Iven/West | Substation | — | — | 8.0 km |
Operator, grid operator and place
Other power plants in Mecklenburg-Vorpommern
- Kraftwerk Rostock Block A514 MW
- Bartow-Pfalz309 MW
- Arcadis Ost I257 MW
- TG_Trafo133 MW
- Werder Kessin 3.BA103 MW
- Gaarz 2.188.3 MW
- Windpark Vietlübbe-Kreien I79.8 MW
- DT (Mecklenburgische Seenplatte)73.3 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.