Großbatteriespeicher Heimertingen is a planned battery storage plant in Heimertingen, Bavaria, Germany, with 10.1 MW of capacity, connected by LEW Verteilnetz GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHeimertingenMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
Address87751 HeimertingenMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
StatusPlannedMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
Capacity10.1 MWMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
Storage capacity20.1 MWhMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
TechnologyBattery storageMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
Grid operatorLEW Verteilnetz GmbHMarktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
Grid connection levelHigh to medium voltage transformer (Umspannebene Hochspannung/Mittelspannung)Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026
Coordinates48.0519, 10.1533Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026

Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.

Request research

How it compares

Großbatteriespeicher Heimertingen is the 203rd-largest of 218 power plants planned, permitted or under construction in Bavaria and the 2,140th-largest of 2,173 in Germany by capacity; its 10.1 MW is <0.1% of the 78,152 MW of power plants planned, permitted or under construction we hold for Germany. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Bavaria203rd of 2187,370 MW0.14%
Germany2,140th of 2,17378,152 MW<0.1%
All power plants planned, permitted or under construction in our data4,930th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 88 substations and 2 CO2 emitters (1,046,073 tCO2e), measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
110 kV substation (OSM way/96241893)Substation——0.1 km
110kV-Umspannwerk KirchdorfSubstation——2.3 km
110 kV substation (OSM way/799620333)Substation——5.3 km
Schwenk WGS Standort AllmendingenCO2 emitter559,473 tCO2e—44 km
Zementwerk SchelklingenCO2 emitter486,600 tCO2e—47 km