Permit notice · Alphen aan den Rijn, South Holland, Netherlands
Grid connection omgevingsvergunning application, Alphen aan den Rijn (prb-2025-2961)
Grid connection omgevingsvergunning application, Alphen aan den Rijn (prb-2025-2961) is a permit notice in Alphen aan den Rijn, South Holland, Netherlands, published 26 Feb 2025.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Alphen aan den Rijn | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 26 Feb 2025 (omgevingsvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Application | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Grid connection | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.1425, 4.7031 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Permit applied for (environmental permit) · source
Nearby
Within 50 km of this permit notice: 519 power plants (410 operating, 11,399 MW), 159 substations, 94 CO2 emitters (49 operating), 88 data centers, 2 processing plants and 2 AI supercomputers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Alphen aan den Rijn (Zonnig Alphen aan den Rijn N11) | Power plant | 8.28 MW | Operating | 3.1 km |
| Solar Alphen aan den Rijn (Today Solar Energy) | Power plant | 2.11 MW | Operating | 3.6 km |
| Solar Ter Aar (Loonbedrijf J.M. van Vliet) | Power plant | 1.4 MW | Operating | 3.8 km |
| Green gas Alphen aan den Rijn (Indaver Compost) | CO2 emitter | — | Operating | 3.9 km |
| 150 kV Alphen a/d Rijn | Substation | — | — | 4.9 km |
| Solar thermal Nieuwveen (Verdel Tussenholding) | CO2 emitter | — | Operating | 7.1 km |
| 380 kV substation (OSM way/778594653) | Substation | — | — | 8.7 km |
| 380 kV substation (OSM way/1342641196) | Substation | — | — | 9.1 km |
| Electric boiler Zoeterwoude (Eneco Heat Production & Industrials) | CO2 emitter | — | Operating | 11 km |
Place
Other permit notices in South Holland
- Battery storage omgevingsplan application, Midden-Delfland (gmb-2026-166439)
- Battery storage omgevingsplan application, Nieuwkoop (gmb-2026-286452)
- Battery storage omgevingsplan application, Rotterdam (gmb-2026-427260)
- Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2025-123830)
- Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2026-395920)
- Battery storage omgevingsplan decision, Lisse (gmb-2026-93012)
- Battery storage omgevingsplan decision, Midden-Delfland (gmb-2026-210961)
- Battery storage omgevingsplan decision, Nieuwkoop (gmb-2026-346519)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.