Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Zoetermeer | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 9 Jan 2026 (omgevingsplan) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Grid connection | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.0680, 4.4890 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (zoning plan) · source
Nearby
Within 50 km of this permit notice: 526 power plants (427 operating, 12,180 MW), 171 substations, 89 CO2 emitters (45 operating), 87 data centers, 2 processing plants and 2 AI supercomputers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Zoetermeer (Sunrock Assets XII) | Power plant | 1.11 MW | Cancelled | 3.0 km |
| Solar Zoetermeer (Eneco Solar) | Power plant | 1.4 MW | Planned | 3.3 km |
| 150 kV Zoetermeer | Substation | — | — | 3.5 km |
| Eurus Windpark Zoetermeer | Power plant | 9 MW | Operating | 3.5 km |
| 150 kV Zoetermeer HSL | Substation | — | — | 4.3 km |
| 380 kV Bleiswijk | Substation | — | — | 4.5 km |
| Geothermal heat Berkel en Rodenrijs (85 Degrees Renewable 3 & 4) | CO2 emitter | — | Operating | 4.7 km |
| Geothermal heat 's-Gravenhage (Haagse Aardwarmte Ypenburg) | CO2 emitter | — | Planned | 6.1 km |
| Geothermal heat Bleiswijk (85 Degrees Renewable 1 & 2) | CO2 emitter | — | Operating | 6.3 km |
Place
Other permit notices in South Holland
- Battery storage omgevingsplan application, Midden-Delfland (gmb-2026-166439)
- Battery storage omgevingsplan application, Nieuwkoop (gmb-2026-286452)
- Battery storage omgevingsplan application, Rotterdam (gmb-2026-427260)
- Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2025-123830)
- Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2026-395920)
- Battery storage omgevingsplan decision, Lisse (gmb-2026-93012)
- Battery storage omgevingsplan decision, Midden-Delfland (gmb-2026-210961)
- Battery storage omgevingsplan decision, Nieuwkoop (gmb-2026-346519)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.