Permit notice · Kampen, Overijssel, Netherlands
Nitrogen natuurvergunning draft decision, Kampen (prb-2024-17940)
Nitrogen natuurvergunning draft decision, Kampen (prb-2024-17940) is a permit notice in Kampen, Overijssel, Netherlands, published 22 Nov 2024.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Kampen | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 22 Nov 2024 (natuurvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Nitrogen | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.5620, 5.9464 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its applicant.Who is behind it up to the parent company, the decision and the asset it is for, and an introduction to the applicant.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (nature permit) · source
Nearby
Within 50 km of this permit notice: 320 power plants (268 operating, 4,647 MW), 65 substations, 35 CO2 emitters (25 operating), 6 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar IJsselmuiden (Erik Postuma Beheer) | Power plant | 1.02 MW | Operating | 0.8 km |
| Solar IJsselmuiden (A.L.C. Onroerend Goed) | Power plant | 4.46 MW | Operating | 0.9 km |
| 110 kV IJsselmuiden | Substation | — | — | 1.4 km |
| Geothermal heat IJsselmuiden (Aardwarmtecluster I KKP) | CO2 emitter | — | Operating | 2.6 km |
| Geothermal heat IJsselmuiden (Aardwarmtecluster I KKP) | CO2 emitter | — | Permitted | 2.6 km |
| Biomass IJsselmuiden (Bio KKP) | Power plant | 14.9 MW | Operating | 3.0 km |
| 110 kV Kampen | Substation | — | — | 4.5 km |
| 110 kV Frankhuis | Substation | — | — | 9.1 km |
| Biomass heat Ens (Wouters Onroerend Goed) | CO2 emitter | — | Operating | 9.7 km |
Place
Other permit notices in Overijssel
- Battery storage omgevingsplan application, Deventer (gmb-2025-269548)
- Battery storage omgevingsplan application, Staphorst (gmb-2025-499039)
- Battery storage omgevingsplan application, Steenwijkerland (gmb-2025-428804)
- Battery storage omgevingsplan application, Zwartewaterland (gmb-2025-533455)
- Battery storage omgevingsplan application, Zwartewaterland (gmb-2026-134776)
- Battery storage omgevingsplan application, Zwartewaterland (gmb-2026-487579)
- Battery storage omgevingsplan application, Zwartewaterland (gmb-2026-56663)
- Battery storage omgevingsplan decision, Deventer (gmb-2025-493134)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.