Permit notice · Meierijstad, North Brabant, Netherlands
Groundwater abstraction watervergunning application, Meierijstad (wsb-2026-21271)
Groundwater abstraction watervergunning application, Meierijstad (wsb-2026-21271) is a permit notice in Meierijstad, North Brabant, Netherlands, published 12 Aug 2026.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Meierijstad | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 12 Aug 2026 (watervergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Application | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Groundwater abstraction | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.6006, 5.6142 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its applicant.Who is behind it up to the parent company, the decision and the asset it is for, and an introduction to the applicant.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Permit applied for (water permit) · source
Nearby
Within 50 km of this permit notice: 687 power plants (512 operating, 3,130 MW), 78 substations, 65 CO2 emitters (41 operating) and 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Erp (Bolst) | Power plant | 1.61 MW | Operating | 2.2 km |
| Solar Erp (Kraan Meerstroom) | Power plant | 2.02 MW | Operating | 2.5 km |
| Solar Erp (One Solar XIX) | Power plant | 2 MW | Operating | 3.7 km |
| Biomass heat Veghel (Mars Nederland) | CO2 emitter | — | Operating | 6.7 km |
| Electric boiler Veghel (Mars Nederland) | CO2 emitter | — | Operating | 6.7 km |
| 150 kV Eerde | Substation | — | — | 8.6 km |
| 150 kV Uden | Substation | — | — | 9.0 km |
| Biomass heat Odiliapeel (Attero) | CO2 emitter | — | Operating | 9.0 km |
| Datacenter Gemert | Data center | — | — | 10 km |
Place
Other permit notices in North Brabant
- Battery storage omgevingsplan application, Bergeijk (gmb-2025-54004)
- Battery storage omgevingsplan application, Reusel-De Mierden (gmb-2026-479275)
- Battery storage omgevingsplan decision, Bergeijk (gmb-2025-256724)
- Battery storage omgevingsplan decision, Gemert-Bakel (gmb-2026-211754)
- Battery storage omgevingsplan decision, Laarbeek (gmb-2025-567631)
- Battery storage omgevingsplan decision, Oisterwijk (gmb-2025-573841)
- Battery storage omgevingsvergunning application, 's-Hertogenbosch (gmb-2026-438078)
- Battery storage omgevingsvergunning application, Altena (gmb-2026-248644)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.