Permit notice · Horst aan de Maas, Limburg, Netherlands
Nitrogen natuurvergunning draft decision, Horst aan de Maas (prb-2024-17632)
Nitrogen natuurvergunning draft decision, Horst aan de Maas (prb-2024-17632) is a permit notice in Horst aan de Maas, Limburg, Netherlands, published 19 Nov 2024.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Horst aan de Maas | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 19 Nov 2024 (natuurvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Nitrogen | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.3939, 6.0026 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (nature permit) · source
Nearby
Within 50 km of this permit notice: 467 power plants (319 operating, 4,396 MW), 136 substations, 38 CO2 emitters (25 operating) and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Sevenum (Protium Holding) | Power plant | 1.65 MW | Planned | 0.2 km |
| Solar Kronenberg (Equestrian Centre de Peelbergen) | Power plant | 1.56 MW | Operating | 3.3 km |
| Solar Maasbree (Protium Holding) | Power plant | 3.1 MW | Planned | 3.4 km |
| Geothermal heat Horst (NAPPA) | CO2 emitter | — | Operating | 6.7 km |
| Geothermal heat Grubbenvorst (Geobalanz) | CO2 emitter | — | Operating | 7.2 km |
| 150 kV Californië | Substation | — | — | 7.6 km |
| 150 kV Boekend | Substation | — | — | 7.7 km |
| 150 kV Horst | Substation | — | — | 8.6 km |
| Green gas Grubbenvorst (Bio Energiecentrale Maashorst) | CO2 emitter | — | Cancelled | 8.9 km |
Place
Other permit notices in Limburg
- Battery storage omgevingsvergunning application, Beek (gmb-2025-3841)
- Battery storage omgevingsvergunning application, Echt-Susteren (gmb-2025-514872)
- Battery storage omgevingsvergunning application, Echt-Susteren (gmb-2026-288455)
- Battery storage omgevingsvergunning application, Echt-Susteren (gmb-2026-288464)
- Battery storage omgevingsvergunning application, Heerlen (gmb-2025-258802)
- Battery storage omgevingsvergunning application, Heerlen (gmb-2026-376025)
- Battery storage omgevingsvergunning application, Landgraaf (gmb-2024-476613)
- Battery storage omgevingsvergunning application, Leudal (gmb-2025-567734)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.