Permit notice · Sittard-Geleen, Limburg, Netherlands
Industry m.e.r.-beoordeling decision, Sittard-Geleen (prb-2025-4656)
Industry m.e.r.-beoordeling decision, Sittard-Geleen (prb-2025-4656) is a permit notice in Sittard-Geleen, Limburg, Netherlands, published 25 Mar 2025, applied for by CSP/AnQore B.V.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Sittard-Geleen | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 25 Mar 2025 (m.e.r.-beoordeling) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Applicant | CSP/AnQore B.V. | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Industry | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.9856, 5.7886 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchNearby
Within 50 km of this permit notice: 246 power plants (169 operating, 4,300 MW), 95 substations, 13 CO2 emitters (9 operating), 10 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 150 kV substation (OSM way/23140502) | Substation | — | — | 0.2 km |
| Swentiboldcentrale | Power plant | 230 MW | Operating | 0.6 km |
| 150 kV substation (OSM way/162280813) | Substation | — | — | 1.0 km |
| 150 kV DSM-1 Swentibold | Substation | — | — | 1.3 km |
| Solar Geleen (F&S solarfield Louisegroeve) | Power plant | 3.37 MW | Operating | 1.4 km |
| Chemelot BKG 01 | CO2 emitter | 2,820,546 tCO2e | — | 2.6 km |
| Solar Geleen (Helwig Vastgoed) | Power plant | 1.29 MW | Operating | 3.2 km |
| Heat pump Brunssum (Stichting Weller Wonen) | CO2 emitter | — | Operating | 12 km |
| Electric boiler Maastricht (Sappi Maastricht) | CO2 emitter | — | Operating | 15 km |
Place
Other permit notices in Limburg
- Battery storage omgevingsvergunning application, Beek (gmb-2025-3841)
- Battery storage omgevingsvergunning application, Echt-Susteren (gmb-2025-514872)
- Battery storage omgevingsvergunning application, Echt-Susteren (gmb-2026-288455)
- Battery storage omgevingsvergunning application, Echt-Susteren (gmb-2026-288464)
- Battery storage omgevingsvergunning application, Heerlen (gmb-2025-258802)
- Battery storage omgevingsvergunning application, Heerlen (gmb-2026-376025)
- Battery storage omgevingsvergunning application, Landgraaf (gmb-2024-476613)
- Battery storage omgevingsvergunning application, Leudal (gmb-2025-567734)
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.