Permit notice · Bronckhorst, Gelderland, Netherlands
Substation omgevingsvergunning draft decision, Bronckhorst (prb-2026-684)
Substation omgevingsvergunning draft decision, Bronckhorst (prb-2026-684) is a permit notice in Bronckhorst, Gelderland, Netherlands, published 16 Jan 2026.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bronckhorst | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 16 Jan 2026 (omgevingsvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Substation | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.9818, 6.2523 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (environmental permit) · source
Nearby
Within 50 km of this permit notice: 402 power plants (282 operating, 2,711 MW), 112 substations, 33 CO2 emitters (22 operating) and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 380 kV Doetinchem | Substation | — | — | 0.0 km |
| 150 kV Langerak | Substation | — | — | 0.1 km |
| 150 kV substation (OSM way/746755863) | Substation | — | — | 0.2 km |
| Solar Laag-Keppel (Dutch Genetics Enterprise) | Power plant | 1.15 MW | Operating | 3.3 km |
| Electric boiler Doetinchem (Papierfabriek Doetinchem) | CO2 emitter | — | Operating | 3.7 km |
| Zonnepark Keppelseweg | Power plant | 9.09 MW | Operating | 4.1 km |
| Heat pump Wehl (B.V. Esbro) | CO2 emitter | — | Operating | 4.1 km |
| Solar Wehl (KS NL13) | Power plant | 16 MW | Operating | 6.3 km |
| Biomass heat Steenderen (Aviko) | CO2 emitter | — | Operating | 11 km |
Place
Other permit notices in Gelderland
- Battery storage omgevingsplan application, Nijmegen (gmb-2025-229302)
- Battery storage omgevingsplan application, Putten (gmb-2026-343049)
- Battery storage omgevingsplan application, West Betuwe (gmb-2025-12037)
- Battery storage omgevingsplan application, West Betuwe (gmb-2026-231801)
- Battery storage omgevingsplan decision, West Betuwe (gmb-2025-88274)
- Battery storage omgevingsplan decision, West Betuwe (gmb-2026-333911)
- Battery storage omgevingsvergunning application, Apeldoorn (gmb-2025-455371)
- Battery storage omgevingsvergunning application, Apeldoorn (gmb-2025-487942)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.