Owner · Company
Net Zero Teesside Power Limited
Net Zero Teesside Power Limited holds a grid connection in the United Kingdom, with 860 MW of capacity.
Portfolio
The 1 asset or right linked to Net Zero Teesside Power Limited, by class, with its role in each, across its 2 records.
- Grid connection1 · 860 MW
Grid connections 1 · 860 MW
| Grid connection | Location | Role | Capacity |
|---|---|---|---|
| Net Zero Teesside Power Project grid connection | England, United Kingdom | Holder | 860 MW |
By country
Where the assets and rights are.
- The United Kingdom1 grid connection
Partners and counterparties
Owners, operators and grid operators on the same assets.
Facts
| Fact | Value | Source |
|---|---|---|
| Location | United Kingdom | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| LEI | 98450040F2B7D50E0450 | Rare Context entity resolution · record · CC0 1.0 · checked 24 Oct 2026 |
| LEI | 98450040F2B7D50E0450 | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| Company number | 12473751 | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
Also recorded as
Sources name Net Zero Teesside Power Limited under 2 records; this page joins them. Links to any of them lead here.
| Name in the source | Identifier | Source |
|---|---|---|
| NET ZERO TEESSIDE POWER LIMITED | party:name:net-zero-teesside-power-limited | NESO TEC Register |
| NET ZERO TEESSIDE POWER LIMITED | party:lei:98450040F2B7D50E0450 | GLEIF LEI |
Own or advise on any of these assets, or looking to buy? Tell us; introductions are private.
Data on this page
- GLEIF LEI. GLEIF LEI, CC0 1.0.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.