Mortenson
Mortenson built 3 data centers in the United States, with 554 MW of IT power between them.
Linked assets
The 3 assets and rights linked to Mortenson, by class, with its role in each.
- Data centers3 · 554 MW
Data centers 3 · 554 MW
| Data center | Location | Role | IT power |
|---|---|---|---|
| OpenAI Stargate Abilene | Texas, United States | Builder | 421 MW |
| Meta Eagle Mountain | Utah, United States | Builder | 133 MW |
| Meta Hyperion | Louisiana, United States | Builder | — |
By country
Where the assets and rights are.
- The United States3 data centers
Partners and counterparties
Owners, operators and grid operators on the same assets.
Own or advise on any of these assets, or looking to buy? Tell us; introductions are private.
Data on this page
- Epoch AI. Epoch AI data centers, CC BY 4.0.