Energy supplier · Company
First Solar
First Solar supplies energy to a data center in the United States, with 146 MW of IT power.
Linked assets
The 1 asset or right linked to First Solar, by class, with its role in each, across its 2 records.
- Data center1 · 146 MW
Data centers 1 · 146 MW
| Data center | Location | Role | IT power |
|---|---|---|---|
| Meta Huntsville | Alabama, United States | Energy supplier | 146 MW |
By country
Where the assets and rights are.
- The United States1 data center
Partners and counterparties
Owners, operators and grid operators on the same assets.
- Meta1 shared
- Nextera Energy Resources1 shared
- Tennessee Valley Authority1 shared
Facts
| Fact | Value | Source |
|---|---|---|
| Location | United States | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| LEI | 549300NPYMLM4NHTOF27 | Rare Context entity resolution · record · CC0 1.0 · checked 24 Oct 2026 |
| LEI | 549300NPYMLM4NHTOF27 | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| Company number | 3658676 | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
Also recorded as
Sources name First Solar under 2 records; this page joins them. Links to any of them lead here.
| Name in the source | Identifier | Source |
|---|---|---|
| First Solar | party:name:first-solar | Epoch AI data centers |
| FIRST SOLAR, INC. | party:lei:549300NPYMLM4NHTOF27 | GLEIF LEI |
Own or advise on any of these assets, or looking to buy? Tell us; introductions are private.
Data on this page
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- GLEIF LEI. GLEIF LEI, CC0 1.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.