Heat plant · Westland, South Holland, Netherlands
Electric boiler De Lier (De Jong Verpakking)
Electric boiler De Lier (De Jong Verpakking) is a planned heat plant in Westland, South Holland, Netherlands, with 9.2 MW of capacity, operated by De Jong Verpakking.
We hold more on this heat plant.Grid operator: available on request.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Westland | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Address | Jogchem van der Houtweg 90, 2678 HA De Lier | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Operator | De Jong Verpakking | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Capacity | 9.2 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Technology | Electric boiler | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Coordinates | 51.9771, 4.2228 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
Know more about this heat plant, or want an introduction to its operator? Ask us.
How it compares
Electric boiler De Lier (De Jong Verpakking) is the 10th-largest of 10 heat plants planned, permitted or under construction in South Holland and the 24th-largest of 43 in the Netherlands by capacity; its 9.2 MW is 1.7% of the 556 MW of heat plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the heat plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| South Holland | 10th of 10 | 214 MW | 4.3% |
| Netherlands | 24th of 43 | 556 MW | 1.7% |
Nearby
Within 50 km of this heat plant: 397 power plants (324 operating, 7,981 MW), 371 permit notices, 115 substations, 22 data centers, 10 CO2 emitters (13,757,062 tCO2e), 6 renewable fuel plants (4 operating, 28.1 MW) and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar De Lier (De Jong Greenpower) | Power plant | 1.21 MW | Operating | 0.0 km |
| Solar De Lier (De Jong Verpakking) | Power plant | 2.6 MW | Operating | 0.0 km |
| 150 kV De Lier | Substation | — | — | 0.1 km |
| Eurus Windpark Rembrandt | Power plant | 2.3 MW | Operating | 0.5 km |
| 380 kV Westerlee | Substation | — | — | 0.6 km |
| 150 kV Opstijgpunt Westerlee | Substation | — | — | 0.7 km |
| Data center omgevingsvergunning application, Westland (gmb-2025-185256) | Permit notice | — | — | 1.0 km |
| Battery storage omgevingsvergunning application, Westland (gmb-2025-354091) | Permit notice | — | — | 1.1 km |
| Battery storage omgevingsvergunning decision, Westland (gmb-2026-15459) | Permit notice | — | — | 1.1 km |
Operator and place
More from De Jong Verpakking
Other heat plants in South Holland
- Electric boiler Rotterdam (Air Liquide Industrie)99.5 MW
- Geothermal heat Maasdijk (HVC Aardwarmte Maasdijk)60.1 MW
- Geothermal heat Naaldwijk (Trias Westland)59.2 MW
- Geothermal heat Poeldijk (Aardwarmte Vogelaer)48.5 MW
- Biomass heat Gouda (Cargill Bioindustrial)34 MW
- Geothermal heat 's-Gravenhage (Haagse Aardwarmte CR-Plein)33.3 MW
- Geothermal heat Pijnacker (Ammerlaan Geothermie)31.2 MW
- Geothermal heat Bergschenhoek (Yeager Energy Bergschenhoek 1)30.6 MW
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.