Heat plant · Nijmegen, Gelderland, Netherlands
Solar thermal Nijmegen (Nyma Makersplaats Vastgoed)
Solar thermal Nijmegen (Nyma Makersplaats Vastgoed) is a planned heat plant in Nijmegen, Gelderland, Netherlands, with 1.16 MW of capacity, operated by Nyma Makersplaats Vastgoed B.V.
We hold more on this heat plant.Grid operator: available on request.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Location | Nijmegen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Address | Winselingseweg 12, 6541 AK Nijmegen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Operator | Nyma Makersplaats Vastgoed B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Capacity | 1.16 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Technology | Solar thermal | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Coordinates | 51.8578, 5.8403 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
Know more about this heat plant, or want an introduction to its operator? Ask us.
How it compares
Solar thermal Nijmegen (Nyma Makersplaats Vastgoed) is the 4th-largest of 4 heat plants planned, permitted or under construction in Gelderland and the 43rd-largest of 43 in the Netherlands by capacity; its 1.16 MW is 0.21% of the 556 MW of heat plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the heat plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Gelderland | 4th of 4 | 18.3 MW | 6.4% |
| Netherlands | 43rd of 43 | 556 MW | 0.21% |
Nearby
Within 50 km of this heat plant: 1,104 permit notices, 529 power plants (400 operating, 2,679 MW), 77 substations, 16 renewable fuel plants (11 operating, 112 MW) and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 150 kV Nijmegen | Substation | — | — | 0.3 km |
| Substation omgevingsvergunning decision, Nijmegen (gmb-2024-487061) | Permit notice | — | — | 0.4 km |
| Nitrogen natuurvergunning decision, Nijmegen (prb-2025-15801) | Permit notice | — | — | 0.5 km |
| Nitrogen natuurvergunning decision, Nijmegen (prb-2025-16745) | Permit notice | — | — | 0.5 km |
| ENGIE Energie Zonnepark Nijmegen | Power plant | 1.96 MW | Operating | 0.6 km |
| Windpark De Groene Delta | Power plant | 7.2 MW | Operating | 0.6 km |
| Solar Nijmegen (VDG Solar) | Power plant | 1.61 MW | Operating | 0.9 km |
| 150 kV substation (OSM way/163989104) | Substation | — | — | 1.5 km |
| 150 kV substation (OSM way/163989101) | Substation | — | — | 1.5 km |
Operator and place
Other heat plants in Gelderland
- Biomass heat Borculo (Frieslandcampina Domo)17.9 MW
- Biomass heat Vuren (Sonac Vuren)15.1 MW
- Biomass heat Beltrum (Groot Zevert Vergisting)6.84 MW
- Electric boiler Doetinchem (Papierfabriek Doetinchem)5 MW
- Biomass heat Lienden (P.C. van Tuijl Kesteren)3.5 MW
- Residual heat Ede Gld (Bio-Energie De Vallei)3.49 MW
- Biomass heat Apeldoorn (Ennatuurlijk Warmteproductie & Assets)2.8 MW
- Residual heat Nijmegen (Radboud Universiteit Nijmegen)2 MW
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.