Grid connection · New York, United States
ISO-NE queue request 1596
ISO-NE queue request 1596 is a grid connection in New York, United States.
We hold more on this right.Capacity, connection date, events, grid operator, location, queue date, status and technology: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
| Status | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
| Capacity | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
| Technology | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
| Grid operator | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
| Queue date | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
| Connection date | Available on request | ISO-NE interconnection request queue (IRTT) · ISO New England Terms and Conditions · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Place
Other grid connections in New York
- Vineyard Mid-Atlantic West grid connection (NYISO C24-003)1,321 MW
- Bluepoint Wind 1 grid connection (NYISO C24-021)1,310 MW
- Sunrise Wind grid connection (NYISO 0766)880 MW
- Empire Wind 1 grid connection (NYISO 0737)816 MW
- EF Barrett - 2 grid connection (NYISO C26-0053)627 MW
- Adirondack Energy Storage Center grid connection (NYISO C26-0042)500 MW
- Cider Solar grid connection (NYISO 0811)500 MW
- Gowanus Gas Turbine Facility Repowering grid connection (NYISO C26-0051)448 MW
Data on this page
- ISO-NE interconnection request queue (IRTT). ISO-NE interconnection request queue (IRTT), ISO New England Terms and Conditions.