Data center · Culpeper County, Virginia, United States

Equinix, LLC - CU 1-4

Equinix, LLC - CU 1-4 is a data center in Culpeper County, Virginia, United States, operated by Equinix, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCulpeper County, VirginiaVirginia DEQ issued data center air permits · Public records · checked 24 Oct 2026
Address18155 Technology Drive, Culpeper, VA 22701Virginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
Permit date10 Aug 2018 (permit number: 41064-8, program: Article 6 - mNSR)Virginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
OperatorEquinix, LLCVirginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
Backup generators59.5 MW (26 generator sets, permit number: 41064-8)Virginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
Coordinates38.4551, -77.9780OpenStreetMap Nominatim geocoder · ODbL 1.0 · checked 24 Oct 2026

Know more about this data center, or want an introduction to its operator? Ask us.

How its operator compares

Equinix, LLC operates 7 of the 244 data centers in the United States in our data with a named owner; 5 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United StatesRankData centersShare
Amazon Data Services, Inc.1st5221%
Microsoft Corporation2nd218.6%
Google3rd197.8%
Meta4th177%
CoreWeave5th83.3%
Equinix, LLC6th72.9%

Timeline

Dated facts about this data center from its sources, oldest first.

  1. Air permit to build issued (minor new source review), no. 41064-8
  2. Equinix, LLC on record as operator

Nearby

Within 50 km of this data center: 6 power plants (4 operating, 3,808 MW), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Greenwood Solar IPower plant100 MWPermitted6.9 km
Marsh Run Generation FacilityPower plant597 MWOperating20 km
RemingtonPower plant706 MWOperating21 km

Operator and place