CO2 emitter · Molenlanden, South Holland, Netherlands
Heat pump Bleskensgraaf Ca (Zuivelcoöperatie Deltamilk BA)
Heat pump Bleskensgraaf Ca (Zuivelcoöperatie Deltamilk BA) is a CO2 emitter in Molenlanden, South Holland, Netherlands, operated by Zuivelcoöperatie Deltamilk BA.
We hold more on this CO2 emitter.Grid operator: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Location | Molenlanden | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Address | Dorpsstraat 18, 2971 AD Bleskensgraaf Ca | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Operating | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Start year | 2024 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Zuivelcoöperatie Deltamilk BA | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 3.38 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Heat pump | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 51.8698, 4.7777 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this CO2 emitter, or want an introduction to its operator? Ask us.
Nearby
Within 50 km of this CO2 emitter: 689 power plants (542 operating, 10,531 MW), 650 permit notices, 152 substations, 61 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wind omgevingsvergunning draft decision, Molenlanden (gmb-2025-75218) | Permit notice | — | — | 4.1 km |
| Substation omgevingsvergunning application, Sliedrecht (gmb-2026-55143) | Permit notice | — | — | 4.6 km |
| Solar park omgevingsvergunning application, Hardinxveld-Giessendam (gmb-2025-444012) | Permit notice | — | — | 4.7 km |
| Onderdoorgang Betuweroute oost | Substation | — | — | 5.1 km |
| Onderdoorgang Betuweroute west | Substation | — | — | 5.5 km |
| Solar Sliedrecht (Van Beest Group) | Power plant | 1.01 MW | Operating | 5.6 km |
| Tractie onderstation Graafstroom | Substation | — | — | 6.2 km |
| Solar Bergambacht (Solar EGP NL South) | Power plant | 1.8 MW | Operating | 6.8 km |
| Solar Dordrecht (Zon Crayestein) | Power plant | 3.48 MW | Operating | 6.8 km |
Operator and place
Other CO2 emitters in South Holland
- Aquathermal heat Gorinchem (N.V. HVC)
- Aquathermal heat Leiden (Vattenfall Warmte)
- Biomass heat Gouda (Cargill Bioindustrial)
- Electric boiler De Lier (De Jong Verpakking)
- Electric boiler De Lier (De Jong Verpakking)
- Electric boiler Dordrecht (N.V. HVC)
- Electric boiler Oudenhoorn (Farm Frites)
- Electric boiler Rotterdam (Air Liquide Industrie)
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.