CO2 emitter · Horst aan de Maas, Limburg, Netherlands
Green gas Grubbenvorst (Bio Energiecentrale Maashorst)
Green gas Grubbenvorst (Bio Energiecentrale Maashorst) is a cancelled CO2 emitter in Horst aan de Maas, Limburg, Netherlands, operated by Bio Energiecentrale Maashorst B.V.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Horst aan de Maas | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Cancelled (withdrawn from the list of projects in management before it was realised) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Bio Energiecentrale Maashorst B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 1.95 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Green gas | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Coordinates | 51.4352, 6.1132 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Research on this CO2 emitter and its operator.Who owns it up to the parent company, its emissions and permits, and an introduction to the operator.
Request researchNearby
Within 50 km of this CO2 emitter: 691 permit notices, 472 power plants (319 operating, 5,058 MW), 174 substations, 7 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Biomass Grubbenvorst (Houbensteyn Heideveld) | Power plant | 1.79 MW | Operating | 0.0 km |
| Nitrogen natuurvergunning application, Horst aan de Maas (prb-2025-11191) | Permit notice | — | — | 0.9 km |
| Nitrogen natuurvergunning application, Horst aan de Maas (prb-2025-11193) | Permit notice | — | — | 1.1 km |
| Nitrogen natuurvergunning application, Horst aan de Maas (prb-2025-18620) | Permit notice | — | — | 1.2 km |
| 150 kV Californië | Substation | — | — | 1.6 km |
| Biomass Grubbenvorst (Grubbenvorst Biomassa) | Power plant | 15 MW | Operating | 1.8 km |
| Solar Grubbenvorst (Wijnen Projects) | Power plant | 5.49 MW | Permitted | 1.8 km |
| 150 kV Horst | Substation | — | — | 2.8 km |
| 150 kV Boekend | Substation | — | — | 5.0 km |
Operator and place
Other CO2 emitters in Limburg
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.