CO2 emitter · Weert, Limburg, Netherlands

Electric boiler Weert (Trespa International)

Electric boiler Weert (Trespa International) is a planned CO2 emitter in Weert, Limburg, Netherlands, operated by Trespa International B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWeertRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
AddressWetering 20, 6002 SM WeertRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusPlanned (SDE subsidy granted, not yet in use)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorTrespa International B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity15 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyElectric boilerRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates51.2429, 5.6376RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this CO2 emitter, or want an introduction to its operator? Ask us.

Nearby

Within 50 km of this CO2 emitter: 755 permit notices, 422 power plants (307 operating, 3,261 MW), 80 substations, 10 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
150 kV WeertheideSubstation——1.4 km
Solar Budel-Dorplein (ESCo Nedzink)Power plant1.07 MWOperating2.1 km
Zonnepark BudelPower plant43.9 MWOperating2.1 km
Solar Budel-Dorplein (International Solar Projects V)Power plant1.39 MWOperating2.2 km
150 kV BudelSubstation——2.5 km
Nitrogen natuurvergunning application, Weert (prb-2024-18029)Permit notice——3.6 km
Nitrogen natuurvergunning application, Weert (prb-2025-15800)Permit notice——4.2 km
Nitrogen natuurvergunning draft decision, Weert (prb-2026-14678)Permit notice——4.2 km
150 kV NederweertSubstation——7.5 km

Operator and place

Other CO2 emitters in Limburg

All 16 CO2 emitters in Limburg, Netherlands

Data on this page