CO2 emitter · Heerenveen, Friesland, Netherlands
Heat pump Heerenveen (Ausnutria Operations)
Heat pump Heerenveen (Ausnutria Operations) is a planned CO2 emitter in Heerenveen, Friesland, Netherlands, operated by Ausnutria Operations B.V.
We hold more on this asset.Grid operator and location: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Location | Heerenveen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Address | Ceres 10-1, 8448 CW Heerenveen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Ausnutria Operations B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 8.83 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Heat pump | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 52.9797, 5.9403 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this CO2 emitter, or want an introduction to its operator? Ask us.
Nearby
Within 50 km of this CO2 emitter: 374 permit notices, 220 power plants (188 operating, 2,841 MW), 55 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Grid connection omgevingsvergunning application, Heerenveen (gmb-2024-525498) | Permit notice | — | — | 0.3 km |
| Solar Heerenveen (A-ware Energy) | Power plant | 1.75 MW | Operating | 0.3 km |
| Groundwater abstraction watervergunning application, Heerenveen (wsb-2026-23784) | Permit notice | — | — | 0.7 km |
| Solar park omgevingsvergunning decision, Heerenveen (prb-2024-20176) | Permit notice | — | — | 0.8 km |
| Solar Heerenveen (Dream Industrial Netherlands Solar) | Power plant | 2.4 MW | Operating | 0.8 km |
| Solar Heerenveen (Dutch Durables Energy 2) | Power plant | 1.57 MW | Operating | 0.8 km |
| 110 kV Heerenveen | Substation | — | — | 2.2 km |
| 110 kV substation (OSM way/168871202) | Substation | — | — | 2.2 km |
| 110 kV Oudehaske | Substation | — | — | 4.7 km |
Operator and place
Other CO2 emitters in Friesland
- Biomass heat Joure (Koninklijke Douwe Egberts)
- Biomass heat Leeuwarden (Snipperhout)
- Biomass heat Sumar (Sonac Burgum)
- Biomass heat Wier (N.V. Empatec)
- Electric boiler Leeuwarden (Bio LNG ECL)
- Electric boiler Leeuwarden (Frieslandcampina Nederland)
- Green gas Heerenveen (Bouw- en Reststoffen Friesland)
- Green gas Holwert (Wadstroom)
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.